top of page

LZ0 Thrust Bearing Build Dates

Updated: Nov 24, 2025

This will be the location for a compilation of build dates that hav / have not had an engine failure. The purpose of this article is to give us some sort of timestamp as to when these engines / vehicles were actually built. Hopefully set some minds at ease as well to show how many true failures there have been. this is a small sampling from a video posted here: https://youtu.be/WmlzcwNtdjY







UPDATE - 11/11 9:10 PM



Update 11/12 7:45 - No new engine failures to report



UPDATE - 11/24/25 9:03PM



75 Comments


msenio
Apr 28

Hey Greg, just bought a new 3 max Silverado LTZ. Build date was March 4/26 , out of Mexico factory.I’m told the motor build date is probably within a week of this . Hope this helps.

Like

dwru123
Apr 12

2026 model year GMC Sierra, purchased Oct. 31, 2025. Truck build date June 2025. 3,250 miles. Got the "Reduced Acceleration" message about 1.5 miles from home. Made it home and shut down engine and restarted, got a "transmission and or engine warning" on dash. Called my local dealership and was told not to start truck, and that they would have it towed to dealership. Later was informed I would be needing a new engine.

Like

2025 Sierra 1500 Elevation with 15.5k miles, build date of 11/24. No issues with the truck or the engine.

Edited
Like

2025 Silverado, June 2025 build date, only 4365 miles before dealer confirmed thrust bearing failure, no check engine light, only indication was a very pronounced rattle/grinding sound when reving the engine.

Like

Sam W
Sam W
Mar 06

I wish the spreadsheet could be updated. I bought a 2026 Sierera with the 3.0 Duramax, with a build date of 10/25. Not sure of the engine build date yet.

On edit, the engine build date is 7/31/25


Edited
Like
Replying to

Should be ok. Mine was built in first week of october and Greg seemed to think September is the cutoff date for bad thrusts.

Like
bottom of page